Lage Zwaluwe Station Area

Regional Transferium as a Strategic Hub for Transportation and Economic Activity

What's coming up?

The municipality of Moerdijk is developing the Lage Zwaluwe station area into a regional transfer hub and strategic transportation hub that will strengthen the connection between Moerdijk Logistics Park, the port area, the Randstad, and the region.

Where is this location?

What is the latest update?

In July 2023, the land surrounding the station area was transferred to a new landowner. As a result, the project can now proceed again. The plan has been in the works for a long time; an initial document was adopted in 2011. In 2017, Arcadis conducted a feasibility study commissioned by the municipality. This feasibility study has not been finalized. An update to the 2017 feasibility study will now be prepared. In the new feasibility document, we will outline the spatial, financial, and social feasibility of the plan. The site has been designated a strategic development location under the regional plans (RIA). In this context, it is important that the plan be reviewed and approved at the regional level.

Sessions were held on November 3, 2021, and February 19, 2022, with various stakeholders to shape the direction and future of the area. These plans are no longer current because they do not sufficiently incorporate the energy transition. This development is linked to the Powerport Moerdijk design forum.  The land within this planning area is subject to municipal preemptive rights under the Municipal Preemptive Rights Act. This is because the land is located within the search area for the 700 hectares of space that must be identified to support the energy transition and economic growth. The final location is expected to be determined in the summer of 2026.  

Ultimately, based on the financial figures and the spatial component, we will draw up a Site Development Agreement (LOO). We intend to submit the LOO to the city council at the same time as the feasibility study so that it can be signed, thereby concluding the initiation phase.

Planning

  • Initiation Phase

    Q1 2024 – Q1 2028

  • Design Phase

    Q2 2028 – Q1 2030

  • Implementation Phase

    Q2 2030 – Q1 2032

  • Evaluation Phase

    Q2 2032

Current Situation

Contact

Project Manager Marieke Simone