Skip to content

A29 closed for two nights and two weekends between the Sabina and Hellegatsplein interchanges (toward Rotterdam)

There will be several nighttime and weekend closures on the A29 in June. Rijkswaterstaat will be resurfacing this road in the direction of Rotterdam during that time. Please allow for up to 17 minutes of additional travel time. 

When is the A29 closed?

The A29 will be closed at the following times:

  • Tuesday, June 9, 9:00 p.m. through Wednesday, June 10, 5:00 a.m.
  • Wednesday, June 10, 9:00 p.m. through Thursday, June 11, 5:00 a.m.
  • Friday, June 12, 9:00 p.m. through Monday, June 15, 5:00 a.m.
  • Friday, June 19, 9:00 p.m. through Monday, June 22, 5:00 a.m.

What has been settled?

The following are closed every night and on weekends:

  • The A29 between the Sabina interchange and the Hellegatsplein interchange toward Rotterdam
  • All on- and off-ramps

Detour Routes

Follow the yellow signs along the road:

  • Toward Rotterdam:via the A16 and the N257-N59

Why is this work being done?

Rijkswaterstaat is performing maintenance on the A29. This includes laying new asphalt and repairing concrete. For example, we are replacing the top layers of asphalt across the entire width of the road. We are also repairing the concrete on a bridge. This maintenance ensures that the A29 remains safe. The work is intentionally being done at night and on weekends, when traffic is lighter. 

Safety comes first

Rijkswaterstaat works every day to ensure safe and smooth traffic flow. Road workers and road inspectors are dedicated to this effort day and night. Road users can contribute to safety by following the signs and obeying the speed limit.

More information

Questions or comments? Visit the Rijkswaterstaat website or call the Rijkswaterstaat National Information Line toll-free at 0800-8002.


Share via: