MFA Willemstad

A sustainable place for young and old

What's coming up?

The construction of a multifunctional building (MFA) in Willemstad that includes an elementary school, a daycare center, a community center, and a gym, with the aim of strengthening social cohesion, safety, and the well-being of residents. The elementary school and daycare center together form an Integrated Child Center (IKC).

Where is this location?

What is the latest update?

On June 22, 2017, the city council adopted the initial document for the Willemstad school development project. This document outlines the framework within which the project must be carried out. The municipality, together with Stichting De Waarden, Stichting Openbaar Basisonderwijs West-Brabant, Stichting Kibeo (a child care organization), and Stichting Buurthuis Irene, explored the possibilities for how they could jointly participate in a new multifunctional facility (MFA) to be built. Bringing together various activities under one roof contributes to a stronger social structure in Willemstad. 

The first phase of the study involved selecting a location. In addition to expanding at the current sites, potential sites for new construction were also evaluated. In November 2019, the city council made a decision regarding the location, choosing the site of the Kogelvangers soccer club on Grintweg. The MFA will be built on the site of the soccer club’s current cafeteria and locker rooms. Those facilities will be relocated to the east side of Grintweg.

The second phase of the study focused on the preferred location, including conducting a soil and traffic study. In addition, during that phase, attention was primarily directed toward developing the program for the MFA, collaboration among the parties (Willem de Zwijger and De Singel elementary schools, the Kibeo childcare organization, the Irene community center, and the municipality of Moerdijk), and the finances. 

The results of the study are positive. On July 13, 2023, the city council approved the results and allocated the necessary funds to develop the design for the new MFA and prepare the planning process. On July 14, 2023, the municipality entered into a cooperation agreement with the two elementary schools and a letter of intent with the childcare organization Kibeo and the operator of the Irene community center.

Following this, a design team was selected. This team developed a plan in consultation with the users. The technical specifications are now being finalized, and the bid documents are being completed. We will include these documents during the award phase of the bidding process.

A preliminary sketch of the outdoor space has been drawn up; the Grintweg is included in this sketch so that it can be safely designed for future users. This sketch will serve as the basis for the further development of the outdoor space.

Work is currently underway on the environmental plan, and the draft plan is expected to enter the approval process later this year (2026).

Planning

  • Building Design

    2025/2026

  • Outdoor Space Design

    2026/2027

  • Urban Planning

    2026/2027

  • Start of Construction

    2027–2028

  • Building completion (note: subject to, among other things, the progress of the planning process)

    2029/2030

Current Situation

Contact

Project Manager Stijn Verschuren
P.O. Box 4
4760AA Zevenbergen
Tel.14 0168
Emailinfo@moerdijk.nl

News

View the plans for the Willemstad MFA during the open house

Read: The Municipality of Moerdijk invites residents, nearby residents, and other interested parties to an open house regarding the new multifunctional facility in…

Following the City Council’s decision on V.V. Kogelvangers, a look ahead at the MFA Willemstad project

On September 12, the city council decided that the Kogelvangers soccer club in Willemstad would get a new clubhouse. This decision also offers new prospects…