Affakkelen Shell Moerdijk

Op dit moment is bij Shell een grote felle vlam te zien. Shell Moerdijk is aan het affakkelen na een storing in de fabriek.

Logistiek Park Moerdijk (LPM)

The Moerdijk Logistics Park (LPM) is the logistics area development that was originally part of the Moerdijk MeerMogelijk area development. Following the final ruling by the Council of State on September 30, 2020, the Port of Moerdijk has taken over the development. Since then, this project page has served as a reference and is no longer actively updated.

The Moerdijk Logistics Park is a project currently underway. The first phase has been completed, the connection to the port area has been established, and further development is proceeding in phases through 2030. For more information, please visit the Port of Moerdijk’s communication channels.

What's coming up?

The Moerdijk Logistics Park is being developed as a sustainable logistics business park at the junction of the A16 and A17 highways. The site is geared toward large-scale logistics companies and logistics operations. The park is intended for companies occupying more than 5 hectares. Companies in the highest environmental categories will expressly not be permitted to establish operations there. In addition, sustainability is central to both the construction and the use of the site.

The developers are developing the logistics park in phases, transforming it into a multimodal logistics hub with connections by road, water, and rail. The total development area covers approximately 720,000 m² and consists of several sub-areas withlarge-scale warehouse and logistics facilities.

Where is this location?

What is the latest update?

The first section of the logistics park has been put into operation. At the same time, construction is continuing on the other sections.

A major milestone was the opening of the Interne Baan, the new connection between the existing port and industrial area and the new logistics park. This connection has been open to freight traffic, emergency services, and public transportation since late 2025 and ensures that the logistics park is directly linked to the existing port area.

Timeline

  • 2026–2030

    Phased further development of the remaining logistics subareas, additional warehouse capacity, green spaces, and infrastructure facilities.

  • 2026

    The first section of the site is operational, and construction on the next phases of the project is in full swing.

  • 2025

    Opening of the Internal Road and commissioning of the first phase of the logistics park. This creates a direct connection between the existing port area and the new logistics park.

  • 2020–2024

    Development of the plans, permitting procedures, site preparation, and infrastructure planning. Port of Moerdijk’s communications indicate that nitrogen-related issues, among other things, have caused delays.

  • September 30, 2020

    The Council of State has given final approval for the development of the Moerdijk Logistics Park. From that point on, Port of Moerdijk will take over the development.