Residents on Vrouwe Jacobstraat in Fijnaart experience flooding during heavy downpours. To address this issue and gradually make Fijnaart climate-resilient, a stormwater management system is being installed on Vrouwe Jacobstraat, Prins Bernhardstraat, Hazebrouckstraat, and Prinses Beatrixstraat. As part of this project, major maintenance will also be carried out on the roadway, parking spaces, and sidewalks, and public green spaces will be prepared for new plantings.

What is the latest update?

  • Preparations for the project began in October 2024.
  • On April 9, an information session was held for residents, where they received more information about the planned construction work and its impact on their neighborhood.

Where is this location?

Planning

Work will begin in January 2026, immediately after the Christmas break. We will install a new storm sewer and perform maintenance on the pavement. We will carry out this work in phases.

  • Start of Work

    Q1 2026

Follow the project on the BouwApp

Would you like to know what's happening on your street? Scan the QR code and follow the project in the BouwApp.

Please note:The information in the app will be updated once the project begins. Until then, updates may not yet be visible.

Drawing

Below is the presentation drawing as it was shown during the information evening: Presentation drawing for the residents' evening

Textual Explanation

Vrouwe Jacobstraat:

  • The roadway will be repaved.
  • The sidewalks are being repaved
  • A stormwater sewer will be installed next to the existing wastewater sewer.
  • Gully inlets will be partially disconnected and connected to the new stormwater sewer system.
  • Existing vegetation will be removed in preparation for the new landscaping plan.
  • A system will be installed at each residence to divert rainwater.

Prins Bernhardstraat:

  • The roadway will be repaved.
  • The sidewalks are being repaved with new tiles.
  • A stormwater sewer will be installed next to the existing wastewater sewer.
  • Gully inlets will be partially disconnected and connected to the new stormwater sewer system.
  • Existing vegetation will be removed in preparation for the new landscaping plan.
  • A system will be installed at each residence to divert rainwater.

Hazebrouckstraat:

  • The roadway will be repaved.
  • Some of the sidewalks will be repaved or fitted with new tiles.
  • A stormwater sewer will be installed next to the existing wastewater sewer.
  • Gully inlets will be partially disconnected and connected to the new stormwater sewer system.
  • Existing vegetation and the pear trees will be removed in preparation for the new landscaping plan.
  • A system will be installed at each residence to divert rainwater.

Princess Beatrix Street:

  • The roadway will be repaved.
  • The sidewalk is being repaved with new tiles.
  • A stormwater sewer will be installed next to the existing wastewater sewer.
  • Gully inlets will be partially disconnected and connected to the new stormwater sewer system.
  • Existing vegetation and two existing trees will be removed in preparation for the new landscaping plan.
  • A system will be installed at each residence to divert rainwater.