Skip to content

March 16, 2026 – Report on the Moerdijk Village Roundtable

Agenda Items

1. Welcome

Liesbeth opens the first village meeting of 2026. Half a year has passed since the canceled meeting in December 2025, during which time a lot has happened in the wake of the news from November 11. The first door-to-door newsletter was distributed in February; the response was positive, and a new edition will be published in April.

Representatives of the village roundtable have held various meetings with politicians and officials in recent months. On February 3, a meeting took place at the Ministry of Climate and Green Growth with Minister Hermans and her senior officials. This was followed on March 5 by a roundtable discussion with members of the House of Representatives from various political parties.

Despite the news from November, the municipality will continue with its ongoing projects. These will be explained one by one by the project leaders and the alderman.

2. Update on Developments at the Waterfront

The project is continuing, despite the long-standing dispute with the contractor over the division of design responsibilities between the municipality and the contractor. Over the past few months, this issue has been thoroughly examined and discussed. The situation is now improving, and efforts are underway to reach an amicable solution. If this trend continues, Andras expects work to begin in about two months. According to Andras, the contractor cannot withdraw from the contract without financial consequences.

In addition to the contractor’s work, various utility, cable, and pipeline projects are underway. Utility work will begin in April: a larger water connection to the harbor area will be installed via a borehole beneath the dike. Baas will then install new water and electrical connections and reroute the existing lines. This is necessary because the current location of the lines in the green belt on the west side of the harbor (Heuvelman and Martens & van Oort warehouses) is hindering tree planting; relocating the lines will free up space there again.

In addition, the contract for the electrical and water cabinets in the new port has been awarded to Seijsener. These facilities are necessary for the proper operation of the port.

3. Update from the core group and the three working groups

Core Group

One-on-one meetings have been held with national political parties, with a consistent effort to involve provincial and local levels as well. Discussions have now taken place with eight parties; these meetings are viewed as constructive. On February 5, a meeting took place with Minister Hermans and two senior officials from the Climate and Green Growth department. She has arranged for the national government to participate in the periodic meetings with the municipality going forward and has committed to ensuring a smooth transition to the new cabinet. In addition, a request has been submitted to

the new state secretary for a follow-up meeting. Eleven parties were present at the roundtable discussion in The Hague, spread across three rounds of discussions. Although formal political statements were not permitted, it was clear that the parties had gained a better understanding of the issues and were asking more pointed questions. The goal remains to maintain maximum pressure on the decision-making process.

We are also actively engaging with the province: Provincial Executive Member Wilma Dirken will visit Moerdijk on April 1 and speak with the village council. If it becomes clear in mid-April that the June decision on a preferred course of action will be postponed again, that information will be shared as soon as possible.

Last Wednesday, the Residents’ Collective Foundation and Knoops hosted an evening event. A thorough legal explanation was provided, but there is a correction: In June, there will definitely not be a final environmental plan ready—only a definitive preferred direction. An irrevocable area plan is not expected—even in the most favorable scenario—until around 2030.

The focus remains on the political track, as preservation through political channels is considered the most promising approach. Questions were raised from the audience asking whether the Village Roundtable had already considered what steps would need to be taken in the event of a possible departure (including the availability of a family doctor). The working groups are not currently addressing this issue. Our first priority is to preserve the village. Any ideas or concerns for the core group and/or working groups can be emailed to info@dorpstafelmoerdijk.nl.

A question was raised as to why investigations are still ongoing. The municipality and Minister Hermans have indicated that they no longer require any additional investigations; however, the province does. On April 1, the provincial executive will be asked to provide clarification on this matter and on the status of the investigations (including the cost-benefit analysis and environmental studies).

Compensation Working Group

This working group has little new information to report at this time. An update will follow at the next village meeting.

Conservation Working Group

The Preservation Working Group currently consists of 10 people and has developed three action plans. For now, it is primarily focused on mounting opposition (Action Plan 1). Various initiatives are underway: the municipality has been approached regarding the village center, the ice rink, and the vegetation covering the skeleton (to be addressed in the fall of 2026). There was recently a coordination meeting regarding various traffic issues (including preventing cut-through traffic). Discussions on these matters are ongoing with the municipality and the port authority. An invitation was sent to the King, Queen, and Amalia, but it has been declined for now so as not to influence the democratic decision-making process. An invitation to Rob Jetten will follow this week. Young people from Moerdijk are encouraged to contact Frank van Lent regarding homes becoming available under the Moerdijk scheme (for purchase or rent).

Five specific actions are currently being planned:

  • Collect and substantiate information under the Woo (Open Government Act).
  • Arrange bus transportation for the House of Representatives debate.
  • Taking a drone photo with local residents on Sunday, March 29 (at 12:30 p.m. on the TPO grounds)
  • Installation of a large banner reading #moerdijkmoetblijven along the A16/A17.
  • The next working group meeting is scheduled for April 1 (subject to change).

Quality of Life/Social Issues Working Group

New participants are welcome. Neighbors’ Day is scheduled again for September 19, and there will also be a scavenger hunt. We welcome your ideas and help. A special program about Moerdijk will air every hour on April 9 on Zuid West TV.

4. Traffic and Public Transportation

Traffic-related issues had been on hold for some time due to a lack of administrative capacity. A new traffic advisor, Sander Bastiaanse, has now started. On February 23, he held an initial meeting with Henk Schakenraad (Port Authority) and residents from the “Preservation” working group. The traffic problems in the village were identified, along with possible improvements.

A key action item is to better restrict freight traffic. New and clearer signs will be installed at Intersection 0 and at the Frisostraat–Appelweg intersection; this is scheduled for March–April. There has also been a request for new “built-up area” signs.

The issue of cut-through traffic was discussed. Although the municipality would like to install cameras, this turns out to be legally complicated because traffic heading toward Appelweg is not formally considered cut-through traffic. Both parties want to work together on this within the bounds of the law; a follow-up meeting will take place in May. Sander Bastiaanse will join the village roundtable in June to provide further clarification. New traffic bottlenecks can be reported to the core group.

Danny notes that a motion regarding license plate registration was submitted during the council meeting on March 12. This could help combat through traffic, but it also has drawbacks for business owners and their customers. The council is considering whether the drawbacks of license plate registration might outweigh the benefits.

5. Update on Housing Projects

Juliana Street

The Council of State has ruled that the appeal filed by local residents is without merit; as a result, the zoning plan is now final. The feasibility of temporary housing at this location is being explored in collaboration with Woonkwartier. This involves 8 flexible housing units for people who have consciously chosen Moerdijk and want to contribute to the village, such as families with children. A rigorous selection process is essential for this. Woonkwartier will handle the leasing.

Former Ankerkuil, Steenweg/Haakonstraat

Following the withdrawal of the project developer (Building4You), the municipality is exploring various options. One of these is to repurchase the land. The goal is to create temporary housing here, in collaboration with the housing authority. This involves 7 flexible-use units that will be rented out.

Update on Steenweg 45

The Winkelmandje can remain at Grintweg 44 for the next five years. No plans are currently in the works for Steenweg 45. Due to the condition of the building, temporary housing is not feasible there. If anyone has ideas for development at this location, they are welcome to share them with the core group or the alderman.

Update on the Steenweg Reconstruction

The engineering firm Newae is developing the plans. The project is expected to be ready for bidding around May 2026. The municipality anticipates that construction will begin in Q1 2027.

Update on Small-Scale Housing Development in De Put

The municipality owns the site and will also acquire the adjacent property (adjacent to Café De Put) in Q2 2026. A project is underway to build a semi-detached home. However, discussions are also taking place with the Water Board, as the new safety zone—which determines whether or not further construction is permitted—may be widened. Two options are being explored:

  1. Build temporary housing at the current location of Café De Put;
  2. Renovate the Café De Put building so that it can be used as rental housing (this is the municipality's preferred option).

Danny notes that selection is important: it’s about people who want to contribute to the village and community life. All housing cooperatives work together on this to ensure that residents are treated equally.

6. Update on the construction of the bike path

The municipality is continuing to make preparations for the construction of the new bike path. The route has been divided into four sections.

Part 1 – Grintweg to the Appelweg intersection

For this section, the bidding process for the reconstruction of the two existing bike paths is currently underway. Construction is expected to begin around the time of the construction industry vacation (either before or after).

Part 2 – From the Appelweg intersection to the Roode Vaart bridge &

Part 3 – Bridge over the Roode Vaart to the intersection after the A17 underpass

The design for these two sections is currently under review by the Water Board and Rijkswaterstaat, in connection with the rerouting of an A-class waterway, work on the dike embankments, and the underpass near the A17. The municipality is also in the process of acquiring the necessary land. The tender for sections 2 and 3 is expected to begin after the construction industry’s summer break.

Part 4 – Toward Zevenbergen-Noord

For this section, discussions are underway with the Water Board, Staatsbosbeheer, and the province regarding the necessary nature compensation measures. Part of the route lies within the Brabant Nature Network. This section is also complex due to flora and fauna requirements; additional studies are ongoing through the end of this year. The results of these studies may influence the final design and planning.

7. Update on Housing for Migrant Workers

Blokdijk 1 (450 people)

The permitting process is underway. The site will have 24/7 management. The developer is implementing a bicycle plan so that migrant workers can use bicycles for transportation. The first residents are expected to move in by the end of this year.

Zwaluwsedijk 7 (112 people)

A preliminary application is pending for this location. Here, too, 24/7 supervision and recreational facilities will be provided.

Thematic Approach to Labor Migration

The municipality is working on a regional approach to gain a better understanding of where migrant workers are staying, who does or does not register, and how the supply chain is organized. This assessment will form the basis for future

Enforcement. Locations are currently being identified; when enforcement will be implemented depends on these findings and regional coordination.

It is emphasized that the development area falls within the “East” planning zone. If this planning zone is ultimately selected, facilities for migrant workers will also have to be phased out over time.

    8. Status Update on LEA and Neighborhood Implementation Plans

    Last Wednesday, the letter of intent for the neighborhood implementation plan was signed. Within Moerdijk, the focus remains on Phase 1 (gift certificates) for the time being. Moerdijk is currently slightly behind other communities in terms of spending these funds. The LEA working group will address this issue shortly.

    To date, approximately €1.3 million has been spent under the program within the three wind clusters.

    9. Update Powerport

    Moerdijk Scheme

    Since December, 17 residents have signed up for the program; these cases are now being forwarded to the notary.

    Preferred Direction and Decision-Making

    The national government, the province, and the municipality intend to make a decision in June regarding the preferred course of action. That decision will guide further planning.

    This will be followed by a lengthy process of planning procedures (including the National Integration Plan and zoning changes). The municipality estimates it will take 4 to 6 years before a planning permit is issued.

    Energy Infrastructure

    Regardless of the choice of the preferred route, the energy projects will continue as planned. The construction of energy grids, the new 380 kV substation, and a new high-voltage substation (preferred locations: Krukweg / Roode Vaart) are urgent and will not be halted. These processes will proceed in parallel with the decision-making process regarding Powerport.

    Provincial Studies

    The province has indicated that additional studies are needed for decision-making in the Provincial Council, including a “light” cost-benefit analysis. The national government and the municipality have indicated that no further studies are needed. The province’s decision will thus help determine the pace of progress leading up to July.

    Transition Image

    Work is underway on a transition model that examines what the transition will look like. It’s possible that the parties involved won’t reach an agreement; in that case, there’s a risk that while projects will continue, there will be little focus left on the other aspects of change in the village.

    Discussions with the Village Council

    There’s a lot of pressure leading up to June, but we also need to look further ahead. The municipality is continuing its dialogue with the village council; Danny calls on those present to continue supporting the working groups.

    Fiber Optics

    Questions have been raised about whether the municipality has halted the fiber-optic installation. Danny explains that this is a private project over which the municipality has no control.

    Housing, Rentals, and Enforcement

    There is a need for greater clarity regarding how long homes released under the Moerdijk Scheme will remain vacant and when a decision will be made to rent them out or re-rent them. Through a preference decision, the municipality can also discuss this with the national government to secure more flexibility for renting out these homes.

    There is a request to establish a work assignment to monitor the homes as they become available, in order to maintain peace and quiet in the village. The municipality will convey this request to the national government.

    Danny emphasized that every Wednesday afternoon, city officials are at the Ankerkuil to discuss topics such as housing, social concerns, etc. Staff members from Surplus are also present.

    10. Final Announcements and Closing Remarks

    • The BuitenBeter app will be replaced by the ZoGemeld app. Reports can still be submitted via the website and by phone.
    • Between mid-March and the end of May, inspectors will be patrolling the municipality of Moerdijk to inspect bridges, culverts, and other water-related structures. This is a mandatory inspection that the municipality conducts on a regular basis.
    • The March 13 issue of the Powerport newsletter has been sent out; anyone interested can sign up.
    • A new village newsletter will be published in April.

    Upcoming village meetings in 2026:

    June 10, September 17, December 14. All meetings will be held at the Ankerkuil, starting at 7:30 p.m.