380 kV high-voltage transmission line between Geertruidenberg and Krimpen a/d IJssel or Crayestein

Overview of all projects to improve energy infrastructure

To prevent the power grid from becoming overloaded, an additional high-voltage transmission line will be built between Geertruidenberg and Krimpen aan den IJssel or Crayestein (near Dordrecht).

TenneT is the initiator of this project and is responsible for constructing the high-voltage transmission line. The Ministry of Climate and Green Growth (KGG) is the competent authority and coordinates the decision-making process.

Where is this location?

There are 10 potential routes under consideration for the high-voltage transmission line. Two of the possible routes run along the A16 through the municipality of Moerdijk.

Source: Memo on Scope and Level of Detail, Ministry of KGG and TenneT

What is the latest update?

Currently, the 10 possible routes for the high-voltage transmission line are being evaluated based on various (environmental) factors.

Comments from the Municipality of Moerdijk

Planning

  • Comprehensive Impact Analysis/Draft Environmental Impact Statement/Preferred Design Decision—Comments Are Welcome

    Mid-2027

  • Preferred Decision (the Preferred Route)

    Late 2027

  • Draft Project Decision—Comments Are Welcome

    Early 2029

  • Project Decision: Only interested parties may still file an appeal with the Council of State

    Late 2029

  • Start of Work

Contact

The construction of the Geertruidenberg–Krimpen a/d IJssel or Crayestein high-voltage transmission line is a TenneT project. The Ministry of Climate and Green Growth (KGG) is responsible for the land-use planning process. Under the heading “More Info,” you’ll find links to the websites of these organizations. If you have any questions for the municipality of Moerdijk, please send an email topowerport@moerdijk.nl.

More information

News

May 12: Open House on the New Power Stations at the Port of Moerdijk

The Ministry of Climate and Green Growth (KGG) and grid operators TenneT and Enexis plan to build new high- and medium-voltage substations in the vicinity of the Moerdijk port and industrial area. They are seeking a single, shared location for the substations. The study plans are available for public review through May 22, 2025. You are invited to provide your advice or input.

Route options announced for new 380 kV high-voltage transmission line

To prevent the power grid from becoming overloaded, an additional high-voltage transmission line will be built between Geertruidenberg and Krimpen aan den IJssel…

June 19: Open House on Energy Projects

The Netherlands is transitioning to green energy. The Ministry of Economic Affairs and Climate Policy will soon be hosting a series of informational evenings to help you…

380 kV High-Voltage Transmission Line Geertruidenberg – Krimpen aan den IJssel or Crayestein

The national power grid must transmit an ever-increasing amount of (renewable) electricity. To ensure a reliable electricity supply in the future, it is necessary to…


Share via: